For qty 1-2, skip the full 6-strategy pipeline: place a single part
or a best-fit pair directly. For larger low quantities, shrink the
work area in both dimensions (sqrt scaling with 2x margin) before
running strategies, with fallback to full area if insufficient.
- Add TryFillSmallQuantity fast path (qty=1 single, qty=2 best-fit pair)
- Add ShrinkWorkArea with proportional dual-axis reduction
- Extract RunFillPipeline helper from Fill()
- Make ShrinkFiller.EstimateStartBox internal with margin parameter
- Add MaxQuantity to FillContext for strategy-level access
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>