Runners bill each job rounded up to the minute, and every job restored
and built the shared projects again. The small suites and the synthetic
nests now share one job that builds once; Engine.Tests, the longest,
runs beside it. A newer push cancels a stale run, and pushes that change
only docs or Markdown skip CI.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The unit-test matrix was the only test job still built in Debug, and the
Engine suite was taking 26-27 of its 30 minutes. In Debug the JIT does not
optimize PortableMath (64 ns per Sin against 17 ns for the runtime's), so
after 49603edd the suite reached the 30-minute limit and was cancelled
(run 42728099456). Every other test job (windows-desktop, the Windows
release build, the server image) already runs Release, which is what
ships; no production project has Debug-only code. The Windows release
workflow still runs OpenNest.Tests in Debug.
Add OpenNest.Desktop (net8.0), the toolkit-neutral layer the WinForms app
and OpenNest.Avalonia will share, and OpenNest.Desktop.Tests with a guard
that the library references no WinForms/WindowsDesktop, System.Drawing.Common
or Avalonia assembly, project setting or (transitive) package.
Both desktop front ends reference it; OpenNest.Avalonia joins OpenNest.sln
and the new tests join the Linux CI matrix. No code moves yet.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Runs the four cross-platform suites as a matrix and the six synthetic
Irregular nests in their own job, with a fail-closed final "tests"
check.
Conflict in ci.yml: take the branch's Linux jobs and keep master's
windows-desktop job unchanged after them. actionlint and the aggregate
checker self-tests pass on the merged file.
The first windows-desktop run hung for 25 minutes with no output and
ran until it was cancelled. Pass --blame-hang-timeout 5m so a test that
is silent for five minutes is killed, named in the log and mini-dumped
into TestResults, then cap the job at 20 minutes and upload all of
TestResults, not just the TRX files.
Checked locally with a throwaway xunit project: a Thread.Sleep(Infinite)
test was killed after the configured inactivity, named in the output,
and left a TRX, a test-order (Sequence) file and a mini dump; dotnet test
exited 1.
Pushes to master only ran the Linux job, which can cross-compile but
not execute OpenNest.WinForms.Tests; Windows test runs happened only on
release branches and tags. Add a windows-2022 job to the cross-platform
workflow that runs OpenNest.WinForms.Tests and OpenNest.FrontEnd.Tests
in Release on every master push and pull request, runs both projects
before failing, and uploads their TRX results.