Commit Graph
3 Commits
Author SHA1 Message Date
aj 4e92d0e8f3 fix(planning): route a cut-off from its start to its far end
A cut-off always runs away from its fixed edge: the origin side, the only
edge guaranteed to be a real sheet edge. The part order is proposed as a
traveling-salesman path over one point per placement, and a cut-off's
point was the middle of its line. The route did not know the tool must
arrive at the line's start and leaves at its far end, so the parts
before a sheet-splitting line finished level with its middle, and the
rapid down to its start crossed parts already cut.

Each placement now has an entry and an exit point; they differ only for
cut-offs (start and departure). Nearest neighbor and Or-opt go on from
each part's exit, and 2-opt costs a reversed run along its own directed
legs; with no cut-off on the plate the exits are not passed and the
symmetric route is unchanged. The part cut before a cut-off faces its
start.

Cut-off direction is not chosen here: the order reads each cut-off's start
and end from its program as given, and the joint search may still reverse a
head-locked far-edge segment.
2026-11-01 16:51:09 -05:00
ajandClaude Opus 5.5 4d55e11318 style: use one spelling across the codebase
The repo mixed variants such as center/centre and color/colour, so a
name could be spelled either way and searches missed half the hits.
Standardize on the US spelling, matching .NET's own APIs (Color, Center).

Wire values owned by other systems keep their spelling: the material
ledger's "Cancelled" hold status and GitHub's "cancelled" job status.

No behavior change beyond the spelling of a few status messages.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 16:11:30 -04:00
aj b8f3d3bf0a fix(cutting): order parts as a short tour and learn blocked approaches
Free-order planning was one depth-first search over parts, contours and
entries. A dead end at one part backtracked through every entry
combination of the part before it (about 1,450 for a square with two
holes) before trying another part order, so a 4 x 4 grid of such parts
ran out of its 20000 expansions (and 200000) although cutting it row by
row is safe.

The whole-part order is now an open travelling-salesman path over part
centres from the start point: nearest neighbour, then 2-opt reversals
and Or-opt moves of one to three parts, never placing a part before a
cutoff or nested-part prerequisite. The existing search then plans
contour order and entries along that order. If a part cannot be
reached without crossing parts already cut, the search learns "cut it
before those", backs up to just before the earliest of them, keeps the
parts cut before that point and re-plans the rest from the tool
position there. An attempt stops backtracking after 8 x entries x
contours expansions without getting further, so it learns instead of
retrying the entries of every earlier part. When nothing new can be
learned the result is a refusal, as before. A preserved order is
planned exactly as before.

16- and 36-part grids, in row order and shuffled, are now ready within
the default budget (they were NoSolutionWithinBudget); a 144-part grid
plans in about half a second.
2026-10-05 23:41:11 -04:00