feat(engine): return the best valid plan at a time limit
DeadlineNestingEngine wraps any engine with a wall-clock limit (any positive time up to the cancellation timer's ~49.7 days). An engine that finishes in time keeps its result, as does a result it returns after the limit. When the limit cancels it, the best whole-job plan it reported (PlanImproved, ranked like Default ranks candidates, a tie going to the later plan) is returned if it passes the layout check; with none the solve fails with TimeoutException. The caller's own cancellation is never turned into a result. Engine plate commits are dropped and the returned result's commits reported once it is known; plans are forwarded only when they beat every plan shown so far. Default now runs Rectangles, then Irregular, then Circles, so a search stopped early already holds a valid plan. Ties still break by candidate order (Irregular, Rectangles, Circles), so for these three the choice is unchanged, and when every candidate throws, the first in that order is still the one rethrown. A test seam takes a run order. Desktop, Console and MCP do not apply a limit yet; Console can solve a job twice (cutout trial and plain), which needs one shared deadline. Mutations killed (10/10): no fallback at the limit, invalid plan accepted, caller cancellation becomes a result, engine commits forwarded, a worse later plan replaces the best, a tie keeps the earlier plan, no upper limit bound, failure rethrown in run order, built-in run order unchanged, run order ignored.
This commit is contained in:
1 parent
8fb95e57b5
commit
23d5362aa1
5 files changed
+515
-12
No files matched your search
@@ -0,0 +1,274 @@
|
||||
using OpenNest.Engine.Jobs;
|
||||
using OpenNest.Engine.NestingEngines;
|
||||
using OpenNest.Engine.NestingEngines.Default;
|
||||
using static OpenNest.Engine.Tests.NestingEngines.JobBuilder;
|
||||
using static OpenNest.Engine.Tests.NestingEngines.Shapes;
|
||||
|
||||
namespace OpenNest.Engine.Tests.NestingEngines;
|
||||
|
||||
public class DeadlineNestingEngineTests
|
||||
{
|
||||
// Two 4x4 squares on 10x10 sheets with no spacing.
|
||||
private static NestJob SquaresJob() =>
|
||||
Job([Part("p", Rectangle(4, 4), 2, RotationPolicy.Fixed(0))], [Stock("s", 10, 10)]);
|
||||
|
||||
private static NestJobResult Layout(NestJob job, params (double X, double Y)[][] sheets)
|
||||
{
|
||||
var builder = new NestJobResultBuilder(job);
|
||||
foreach (var sheet in sheets)
|
||||
builder.AddSheet(job.Plates[0], sheet.Select(p => ("p", p.X, p.Y, 0.0)));
|
||||
return builder.Build(
|
||||
builder.IsComplete ? NestJobStopReason.Completed : NestJobStopReason.NoPlacementFound
|
||||
);
|
||||
}
|
||||
|
||||
private static NestJobResult OneSheet(NestJob job) => Layout(job, [(0, 0), (5, 0)]);
|
||||
|
||||
private static NestJobResult TwoSheets(NestJob job) => Layout(job, [(0, 0)], [(0, 0)]);
|
||||
|
||||
private static NestJobResult Overlapping(NestJob job) => Layout(job, [(0, 0), (1, 0)]);
|
||||
|
||||
private sealed class Stub(
|
||||
Func<NestJob, IProgress<NestJobProgress>?, CancellationToken, NestJobResult> solve
|
||||
) : INestingEngine
|
||||
{
|
||||
public NestJobResult Solve(
|
||||
NestJob job,
|
||||
IProgress<NestJobProgress>? progress = null,
|
||||
CancellationToken token = default
|
||||
) => solve(job, progress, token);
|
||||
}
|
||||
|
||||
private sealed class Recorder : IProgress<NestJobProgress>
|
||||
{
|
||||
public List<NestJobProgress> Reports { get; } = new();
|
||||
|
||||
public void Report(NestJobProgress value) => Reports.Add(value);
|
||||
}
|
||||
|
||||
private static void Plan(IProgress<NestJobProgress>? progress, NestJobResult plan) =>
|
||||
progress?.Report(new NestJobProgress(NestJobStage.PlanImproved, "", -1, 0, 0, Plan: plan));
|
||||
|
||||
/// <summary>Reports the given plans, then waits for cancellation like a long search.</summary>
|
||||
private static Stub ReportsThenRunsUntilCancelled(params Func<NestJob, NestJobResult>[] plans) =>
|
||||
new((job, progress, token) =>
|
||||
{
|
||||
foreach (var plan in plans)
|
||||
Plan(progress, plan(job));
|
||||
token.WaitHandle.WaitOne(TimeSpan.FromSeconds(30));
|
||||
token.ThrowIfCancellationRequested();
|
||||
throw new InvalidOperationException("the limit never cancelled the search");
|
||||
});
|
||||
|
||||
private static readonly TimeSpan Short = TimeSpan.FromMilliseconds(200);
|
||||
|
||||
[Fact]
|
||||
public void AnEngineThatFinishesInTimeKeepsItsResult()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
var result = TwoSheets(job);
|
||||
var progress = new Recorder();
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
new Stub((_, p, _) =>
|
||||
{
|
||||
Plan(p, OneSheet(job));
|
||||
return result;
|
||||
}),
|
||||
TimeSpan.FromMinutes(1)
|
||||
).Solve(job, progress);
|
||||
|
||||
Assert.Same(result, solved);
|
||||
var commits = progress.Reports.Where(r => r.Stage == NestJobStage.PlateCommitted).ToList();
|
||||
Assert.Equal(2, commits.Count);
|
||||
Assert.Equal(2, commits[^1].CommittedParts);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void AtTheLimitTheBestValidPlanIsReturnedAndCommitted()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
NestJobResult? cheap = null;
|
||||
var progress = new Recorder();
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
ReportsThenRunsUntilCancelled(TwoSheets, j => cheap = OneSheet(j), TwoSheets),
|
||||
Short
|
||||
).Solve(job, progress);
|
||||
|
||||
Assert.Same(cheap, solved);
|
||||
var commits = progress.Reports.Where(r => r.Stage == NestJobStage.PlateCommitted).ToList();
|
||||
Assert.Single(commits);
|
||||
Assert.Equal(2, commits[0].CommittedParts);
|
||||
// The later, worse plan is not shown after the better one.
|
||||
var shown = progress.Reports.Where(r => r.Stage == NestJobStage.PlanImproved).ToList();
|
||||
Assert.Equal(2, shown.Count);
|
||||
Assert.Same(cheap, shown[^1].Plan);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void AnInvalidPlanIsNeverReturned()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
Assert.NotEmpty(NestLayoutCheck.Violations(job, Overlapping(job)));
|
||||
|
||||
var error = Assert.Throws<TimeoutException>(() =>
|
||||
new DeadlineNestingEngine(ReportsThenRunsUntilCancelled(Overlapping), Short).Solve(job)
|
||||
);
|
||||
|
||||
Assert.Contains("No valid layout", error.Message);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void AValidPlanBeatsAnEarlierInvalidOne()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
NestJobResult? valid = null;
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
ReportsThenRunsUntilCancelled(Overlapping, j => valid = TwoSheets(j)),
|
||||
Short
|
||||
).Solve(job);
|
||||
|
||||
Assert.Same(valid, solved);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void WithNoPlanTheLimitIsATimeout()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
|
||||
Assert.Throws<TimeoutException>(() =>
|
||||
new DeadlineNestingEngine(ReportsThenRunsUntilCancelled(), Short).Solve(job)
|
||||
);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void TheCallersCancellationIsNeverTurnedIntoAResult()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
using var caller = new CancellationTokenSource(Short);
|
||||
|
||||
Assert.ThrowsAny<OperationCanceledException>(() =>
|
||||
new DeadlineNestingEngine(ReportsThenRunsUntilCancelled(OneSheet), TimeSpan.FromMinutes(1))
|
||||
.Solve(job, null, caller.Token)
|
||||
);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void TheCallersCancellationIsNeverReportedAsATimeout()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
using var caller = new CancellationTokenSource(Short);
|
||||
|
||||
Assert.ThrowsAny<OperationCanceledException>(() =>
|
||||
new DeadlineNestingEngine(ReportsThenRunsUntilCancelled(), TimeSpan.FromMinutes(1))
|
||||
.Solve(job, null, caller.Token)
|
||||
);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void TheEnginesOwnCommitsAreNotForwarded()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
var result = OneSheet(job);
|
||||
var progress = new Recorder();
|
||||
|
||||
new DeadlineNestingEngine(
|
||||
new Stub((_, p, _) =>
|
||||
{
|
||||
p?.Report(new NestJobProgress(NestJobStage.PlateCommitted, "s", 0, 1, 2));
|
||||
return result;
|
||||
}),
|
||||
TimeSpan.FromMinutes(1)
|
||||
).Solve(job, progress);
|
||||
|
||||
Assert.Single(progress.Reports, r => r.Stage == NestJobStage.PlateCommitted);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void ALimitMustFitACancellationTimer()
|
||||
{
|
||||
var engine = new Stub((_, _, _) => null!);
|
||||
foreach (var bad in new[] { TimeSpan.Zero, TimeSpan.FromSeconds(-1), TimeSpan.FromDays(50) })
|
||||
Assert.Throws<ArgumentOutOfRangeException>(() => new DeadlineNestingEngine(engine, bad));
|
||||
Assert.Equal(
|
||||
DeadlineNestingEngine.MaxLimit,
|
||||
new DeadlineNestingEngine(engine, DeadlineNestingEngine.MaxLimit).Limit
|
||||
);
|
||||
Assert.Throws<ArgumentNullException>(() => new DeadlineNestingEngine(null!, Short));
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void ATiedLaterPlanReplacesTheEarlierOne()
|
||||
{
|
||||
// Engines report only plans they rank higher, so a tie follows the engine's judgment.
|
||||
var job = SquaresJob();
|
||||
NestJobResult? later = null;
|
||||
var progress = new Recorder();
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
ReportsThenRunsUntilCancelled(OneSheet, j => later = Layout(j, [(6, 0), (6, 4)])),
|
||||
Short
|
||||
).Solve(job, progress);
|
||||
|
||||
Assert.Same(later, solved);
|
||||
Assert.Same(later, progress.Reports.Last(r => r.Stage == NestJobStage.PlanImproved).Plan);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void AResultReturnedAfterTheLimitIsTheEnginesOwn()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
var result = TwoSheets(job);
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
new Stub((j, p, token) =>
|
||||
{
|
||||
Plan(p, OneSheet(j));
|
||||
token.WaitHandle.WaitOne(TimeSpan.FromSeconds(30));
|
||||
return result;
|
||||
}),
|
||||
Short
|
||||
).Solve(job);
|
||||
|
||||
Assert.Same(result, solved);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void OtherProgressIsForwarded()
|
||||
{
|
||||
var job = SquaresJob();
|
||||
var progress = new Recorder();
|
||||
var stage = new NestJobProgress(NestJobStage.EvaluatingCandidate, "s", 0, 0, 2);
|
||||
|
||||
new DeadlineNestingEngine(
|
||||
new Stub((j, p, _) =>
|
||||
{
|
||||
p?.Report(stage);
|
||||
return OneSheet(j);
|
||||
}),
|
||||
TimeSpan.FromMinutes(1)
|
||||
).Solve(job, progress);
|
||||
|
||||
Assert.Same(stage, progress.Reports[0]);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void DefaultUnderALimitReturnsTheFasterCandidatesResult()
|
||||
{
|
||||
// The slow candidate is first in tie-break order but runs second, so the limit finds
|
||||
// the quick candidate's layout already reported.
|
||||
var job = SquaresJob();
|
||||
NestJobResult? quick = null;
|
||||
var slow = ReportsThenRunsUntilCancelled();
|
||||
var fast = new Stub((j, _, _) => quick = TwoSheets(j));
|
||||
|
||||
var solved = new DeadlineNestingEngine(
|
||||
new DefaultNestingEngine(new Func<INestingEngine>[] { () => slow, () => fast }, new[] { 1, 0 }),
|
||||
Short
|
||||
).Solve(job);
|
||||
|
||||
Assert.Same(quick, solved);
|
||||
}
|
||||
}
|
||||
@@ -33,6 +33,62 @@ public class DefaultNestingEngineTests
|
||||
private static NestJobResult Overlapping(NestJob job) => Layout(job, Sheet((0, 0), (1, 0)));
|
||||
private static NestJobResult OnePlaced(NestJob job) => Layout(job, Sheet((0, 0)));
|
||||
|
||||
[Fact]
|
||||
public void BuiltInDefaultRunsRectanglesBeforeIrregular()
|
||||
{
|
||||
// Rectangles is the cheap, always-valid fallback: under a limit it must have reported
|
||||
// its plan before the slower Irregular search starts. Candidates stay in tie-break
|
||||
// order Irregular, Rectangles, Circles.
|
||||
Assert.Equal(new[] { 1, 0, 2 }, new DefaultNestingEngine().RunOrder);
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void DefaultsRunOrderNeverChangesTheChoice()
|
||||
{
|
||||
// Equal layouts keep tie-break (candidate) order whichever candidate runs first.
|
||||
var job = SquaresJob();
|
||||
var first = OneSheet(job);
|
||||
var second = OneSheet(job);
|
||||
Func<INestingEngine>[] candidates =
|
||||
[
|
||||
() => new Stub((_, _, _) => first),
|
||||
() => new Stub((_, _, _) => second),
|
||||
];
|
||||
|
||||
Assert.Same(first, new DefaultNestingEngine(candidates, new[] { 0, 1 }).Solve(job));
|
||||
Assert.Same(first, new DefaultNestingEngine(candidates, new[] { 1, 0 }).Solve(job));
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void DefaultRejectsARunOrderThatIsNotAPermutation()
|
||||
{
|
||||
Func<INestingEngine>[] candidates =
|
||||
[
|
||||
() => new Stub((_, _, _) => null!),
|
||||
() => new Stub((_, _, _) => null!),
|
||||
];
|
||||
|
||||
Assert.Throws<ArgumentException>(() => new DefaultNestingEngine(candidates, new[] { 0, 0 }));
|
||||
Assert.Throws<ArgumentException>(() => new DefaultNestingEngine(candidates, new[] { 0 }));
|
||||
Assert.Throws<ArgumentException>(() => new DefaultNestingEngine(candidates, new[] { 0, 2 }));
|
||||
}
|
||||
|
||||
[Fact]
|
||||
public void WhenEveryCandidateThrowsTheFirstInTieBreakOrderIsRethrown()
|
||||
{
|
||||
Func<INestingEngine>[] candidates =
|
||||
[
|
||||
() => new Stub((_, _, _) => throw new InvalidOperationException("first")),
|
||||
() => new Stub((_, _, _) => throw new InvalidOperationException("second")),
|
||||
];
|
||||
|
||||
var error = Assert.Throws<InvalidOperationException>(() =>
|
||||
new DefaultNestingEngine(candidates, new[] { 1, 0 }).Solve(SquaresJob())
|
||||
);
|
||||
|
||||
Assert.Equal("first", error.Message);
|
||||
}
|
||||
|
||||
private sealed class Stub(Func<NestJob, IProgress<NestJobProgress>?, CancellationToken, NestJobResult> solve) : INestingEngine
|
||||
{
|
||||
public NestJobResult Solve(NestJob job, IProgress<NestJobProgress>? progress = null, CancellationToken token = default) =>
|
||||
|
||||
@@ -0,0 +1,114 @@
|
||||
#nullable enable
|
||||
using System;
|
||||
using System.Threading;
|
||||
using OpenNest.Engine.Jobs;
|
||||
|
||||
namespace OpenNest.Engine.NestingEngines;
|
||||
|
||||
/// <summary>
|
||||
/// Runs another engine under a wall-clock limit. When the engine finishes in time its result
|
||||
/// is returned unchanged. When the limit cancels it, the best whole-job plan it reported
|
||||
/// (<see cref="NestJobStage.PlanImproved"/>) is returned instead, provided that plan passes
|
||||
/// <see cref="NestLayoutCheck"/>; plans are ranked like <see cref="CandidateScore"/> ranks
|
||||
/// results, and a tie goes to the later plan, as engines report only plans they rank higher.
|
||||
/// With no valid plan by the limit, the solve fails with a <see cref="TimeoutException"/>.
|
||||
/// Cancellation by the caller's own token is never turned into a result. A result the engine
|
||||
/// returns, even after the limit, is its own and is returned unchanged.
|
||||
/// </summary>
|
||||
/// <remarks>
|
||||
/// The engine's plate commits are not forwarded: the returned result's commits are reported
|
||||
/// once it is known. Plans are forwarded only when they beat every plan shown so far. A
|
||||
/// limited solve depends on the clock, so it is not reproducible like an unlimited one, and
|
||||
/// the engine may overrun the limit by however long it takes to observe cancellation. Plans
|
||||
/// are expected from the solve thread, as the built-in engines report them.
|
||||
/// </remarks>
|
||||
public sealed class DeadlineNestingEngine : INestingEngine
|
||||
{
|
||||
/// <summary>The longest limit a cancellation timer accepts.</summary>
|
||||
public static readonly TimeSpan MaxLimit = TimeSpan.FromMilliseconds(uint.MaxValue - 1.0);
|
||||
|
||||
private readonly INestingEngine inner;
|
||||
|
||||
public DeadlineNestingEngine(INestingEngine inner, TimeSpan limit)
|
||||
{
|
||||
ArgumentNullException.ThrowIfNull(inner);
|
||||
if (limit <= TimeSpan.Zero || limit > MaxLimit)
|
||||
throw new ArgumentOutOfRangeException(
|
||||
nameof(limit),
|
||||
$"The time limit must be positive and at most {MaxLimit}."
|
||||
);
|
||||
this.inner = inner;
|
||||
Limit = limit;
|
||||
}
|
||||
|
||||
public TimeSpan Limit { get; }
|
||||
|
||||
public NestJobResult Solve(
|
||||
NestJob job,
|
||||
IProgress<NestJobProgress>? progress = null,
|
||||
CancellationToken token = default
|
||||
)
|
||||
{
|
||||
ArgumentNullException.ThrowIfNull(job);
|
||||
token.ThrowIfCancellationRequested();
|
||||
using var deadline = CancellationTokenSource.CreateLinkedTokenSource(token);
|
||||
deadline.CancelAfter(Limit);
|
||||
var plans = new BestPlan(job, progress);
|
||||
|
||||
NestJobResult result;
|
||||
try
|
||||
{
|
||||
result = inner.Solve(job, plans, deadline.Token);
|
||||
}
|
||||
catch (OperationCanceledException)
|
||||
when (!token.IsCancellationRequested && deadline.IsCancellationRequested)
|
||||
{
|
||||
if (plans.Best is not { Valid: true } best)
|
||||
throw new TimeoutException(
|
||||
$"No valid layout was found within the {Limit.TotalSeconds:0.###} s time limit."
|
||||
);
|
||||
result = best.Result;
|
||||
}
|
||||
|
||||
token.ThrowIfCancellationRequested();
|
||||
if (result == null)
|
||||
throw new InvalidOperationException("The engine returned no result.");
|
||||
CandidateProgress.ReportCommits(result, progress);
|
||||
return result;
|
||||
}
|
||||
|
||||
/// <summary>Keeps the best reported plan and forwards everything but plate commits.</summary>
|
||||
private sealed class BestPlan(NestJob job, IProgress<NestJobProgress>? inner)
|
||||
: IProgress<NestJobProgress>
|
||||
{
|
||||
public CandidateScore? Best { get; private set; }
|
||||
|
||||
public void Report(NestJobProgress value)
|
||||
{
|
||||
if (value == null || value.Stage == NestJobStage.PlateCommitted)
|
||||
return;
|
||||
if (value.Stage != NestJobStage.PlanImproved)
|
||||
{
|
||||
inner?.Report(value);
|
||||
return;
|
||||
}
|
||||
if (value.Plan == null)
|
||||
return;
|
||||
|
||||
CandidateScore plan;
|
||||
try
|
||||
{
|
||||
plan = CandidateScore.Of(job, value.Plan, 0);
|
||||
}
|
||||
catch (Exception ex) when (ex is not OperationCanceledException)
|
||||
{
|
||||
// A plan that cannot be scored is never kept or shown.
|
||||
return;
|
||||
}
|
||||
if (Best != null && Best.IsBetterThan(plan))
|
||||
return;
|
||||
Best = plan;
|
||||
inner?.Report(value);
|
||||
}
|
||||
}
|
||||
}
|
||||
@@ -22,37 +22,76 @@ namespace OpenNest.Engine.NestingEngines.Default;
|
||||
/// cheap, valid fallback for the rest. Circles bids only when every part is round, and otherwise
|
||||
/// returns everything unplaced at once.
|
||||
/// A candidate that throws or returns no result is skipped; when every candidate throws, the
|
||||
/// first exception is rethrown. Cancellation stops the search. Candidates' plate commits are not forwarded; the chosen
|
||||
/// result's commits are reported once it is selected.
|
||||
/// exception of the first in tie-break order is rethrown. Cancellation stops the search.
|
||||
/// Candidates' plate commits are not forwarded; the chosen result's commits are reported once it
|
||||
/// is selected.
|
||||
///
|
||||
/// Candidates' whole-job plans (<see cref="NestJobStage.PlanImproved"/>) are scored the same way
|
||||
/// and reported only when one beats every plan reported so far, so a later candidate never shows a
|
||||
/// worse plan after a better one. A candidate result that beats them is reported too, and the
|
||||
/// chosen result is always the last plan reported.
|
||||
///
|
||||
/// Rectangles, the quick and always-valid fallback, runs first, then Irregular, then Circles, so
|
||||
/// a caller that stops the search early, such as <see cref="DeadlineNestingEngine"/>, already
|
||||
/// holds a valid plan. Ties still break by candidate (tie-break) order, so for these three
|
||||
/// candidates the run order does not change the choice.
|
||||
///
|
||||
/// Deterministic: candidates run one after another and the choice uses no clock.
|
||||
/// </summary>
|
||||
public sealed class DefaultNestingEngine : INestingEngine
|
||||
{
|
||||
private readonly IReadOnlyList<Func<INestingEngine>> candidates;
|
||||
private readonly IReadOnlyList<int> runOrder;
|
||||
|
||||
public DefaultNestingEngine()
|
||||
: this(new Func<INestingEngine>[]
|
||||
{
|
||||
() => new IrregularNestingEngine(), () => new RectanglesNestingEngine(), () => new CirclesNestingEngine(),
|
||||
})
|
||||
: this(
|
||||
new Func<INestingEngine>[]
|
||||
{
|
||||
() => new IrregularNestingEngine(),
|
||||
() => new RectanglesNestingEngine(),
|
||||
() => new CirclesNestingEngine(),
|
||||
},
|
||||
new[] { 1, 0, 2 })
|
||||
{
|
||||
}
|
||||
|
||||
/// <summary>Test seam: candidate engines in tie-break order.</summary>
|
||||
/// <summary>Test seam: candidate engines in tie-break order, run in that order.</summary>
|
||||
internal DefaultNestingEngine(IReadOnlyList<Func<INestingEngine>> candidates)
|
||||
: this(candidates, Enumerable.Range(0, candidates?.Count ?? 0).ToArray())
|
||||
{
|
||||
}
|
||||
|
||||
/// <summary>Test seam: candidate engines in tie-break order, and the order to run them in
|
||||
/// (a permutation of their indexes). Cost comparison has a relative tolerance, so with three
|
||||
/// or more near-tied candidates the run order can matter.</summary>
|
||||
internal DefaultNestingEngine(
|
||||
IReadOnlyList<Func<INestingEngine>> candidates,
|
||||
IReadOnlyList<int> runOrder
|
||||
)
|
||||
{
|
||||
ArgumentNullException.ThrowIfNull(candidates);
|
||||
ArgumentNullException.ThrowIfNull(runOrder);
|
||||
if (candidates.Count == 0)
|
||||
throw new ArgumentException("At least one candidate engine is required.", nameof(candidates));
|
||||
throw new ArgumentException(
|
||||
"At least one candidate engine is required.",
|
||||
nameof(candidates)
|
||||
);
|
||||
if (
|
||||
runOrder.Count != candidates.Count
|
||||
|| runOrder.Distinct().Count() != candidates.Count
|
||||
|| runOrder.Any(i => i < 0 || i >= candidates.Count)
|
||||
)
|
||||
throw new ArgumentException(
|
||||
"The run order must list every candidate index once.",
|
||||
nameof(runOrder)
|
||||
);
|
||||
this.candidates = candidates;
|
||||
this.runOrder = runOrder;
|
||||
}
|
||||
|
||||
/// <summary>Candidate indexes in the order they run.</summary>
|
||||
internal IReadOnlyList<int> RunOrder => runOrder;
|
||||
|
||||
public NestJobResult Solve(
|
||||
NestJob job,
|
||||
IProgress<NestJobProgress>? progress = null,
|
||||
@@ -64,8 +103,9 @@ public sealed class DefaultNestingEngine : INestingEngine
|
||||
var forward = progress == null ? null : new PlanFilter(job, progress, token);
|
||||
CandidateScore? best = null;
|
||||
ExceptionDispatchInfo? firstFailure = null;
|
||||
var firstFailureOrder = int.MaxValue;
|
||||
|
||||
for (var order = 0; order < candidates.Count; order++)
|
||||
foreach (var order in runOrder)
|
||||
{
|
||||
token.ThrowIfCancellationRequested();
|
||||
NestJobResult? result;
|
||||
@@ -78,7 +118,11 @@ public sealed class DefaultNestingEngine : INestingEngine
|
||||
catch (Exception ex)
|
||||
{
|
||||
// A canceled solve is rethrown by the token checks around each candidate.
|
||||
firstFailure ??= ExceptionDispatchInfo.Capture(ex);
|
||||
if (order < firstFailureOrder)
|
||||
{
|
||||
firstFailure = ExceptionDispatchInfo.Capture(ex);
|
||||
firstFailureOrder = order;
|
||||
}
|
||||
continue;
|
||||
}
|
||||
if (result == null)
|
||||
|
||||
+17
-2
@@ -11,7 +11,7 @@ in `OpenNest.Engine/NestingEngines/<Name>/`, its tests in `OpenNest.Engine.Tests
|
||||
|
||||
| Engine | Best for | Method |
|
||||
|---|---|---|
|
||||
| Default | Any job; used when no engine is named | Runs Irregular, Rectangles and Circles, checks each layout with the layout check and keeps the best: valid first, then fewest unplaced parts, then lowest salvage-credited cost, then the largest compactness offcut; remaining ties keep the earlier engine |
|
||||
| Default | Any job; used when no engine is named | Runs Irregular, Rectangles and Circles, checks each layout with the layout check and keeps the best: valid first, then fewest unplaced parts, then lowest salvage-credited cost, then the largest compactness offcut; remaining ties keep the engine listed first here (whichever runs first) |
|
||||
| Rectangles | Plain and near-rectangular plates | Each part packed as the box of its material at its minimum-area rotation, using a maximal-rectangles free list; stock chosen sheet by sheet by salvage-credited look-ahead cost |
|
||||
| Circles | Round parts: blanks, washers, flanges, gears by their tip circle | Each part packed as its minimum enclosing circle at centers tangent to two of walls, placed discs and clamp keep-outs, with hexagonal and square lattice seeds; bids only when every part is round; stock chosen as Rectangles does, plus whole-job runs preferring each stock and a tail re-plan |
|
||||
| Irregular | Irregular profiles | No-fit-polygon frontier packing with gap filling and best-fit pairs, six whole-job strategy variants and a tail re-plan |
|
||||
@@ -20,7 +20,10 @@ in `OpenNest.Engine/NestingEngines/<Name>/`, its tests in `OpenNest.Engine.Tests
|
||||
|
||||
Neither Irregular nor Rectangles wins every job, even within its own lane, so Default runs both
|
||||
rather than choosing by part shape; Rectangles adds little time and is also the fallback when an
|
||||
Irregular layout fails the check. A candidate that throws is skipped. Default routes the whole job:
|
||||
Irregular layout fails the check. Default runs Rectangles first, then Irregular, then Circles, so
|
||||
a search stopped early already holds a valid plan; ties still go to the earlier engine in the
|
||||
table order (Irregular, Rectangles, Circles), so the run order does not change the choice. A
|
||||
candidate that throws is skipped. Default routes the whole job:
|
||||
engines cannot share a sheet, so a job mixing plain and irregular parts goes to both engines whole.
|
||||
Circles is a third candidate that bids only on round jobs (see below), so a job mixing round and
|
||||
other parts goes to Irregular and Rectangles.
|
||||
@@ -49,6 +52,18 @@ progress sink.
|
||||
|
||||
Plug-ins may report plans the same way; FlatBar and the fixed-strategy engines do not.
|
||||
|
||||
### Time limits
|
||||
|
||||
`DeadlineNestingEngine` wraps any engine with a wall-clock limit. An engine that finishes in time
|
||||
keeps its result, as does one that ignores cancellation and returns a result late. At the limit the search is cancelled and the best reported plan that passes the
|
||||
layout check is returned instead (ranked like Default ranks candidates, a tie going to the later
|
||||
plan), so the result may leave parts unplaced; with no valid plan the solve fails with a
|
||||
`TimeoutException`. The caller's own cancellation still cancels. A limited solve depends on the
|
||||
clock, so it is not reproducible, and it can overrun the limit by however long the engine takes to
|
||||
notice cancellation. A limit can be any positive time up to about 49.7 days (the cancellation timer's range).
|
||||
Desktop, Console and MCP do not apply a limit yet; Console can solve a job twice (with and without
|
||||
cutouts), so a limit there needs one deadline shared across both solves.
|
||||
|
||||
Interactive Fill shows its rectangle best-fit (box packing) layout before the best-fit pair
|
||||
phase, whose first computation for a drawing can take a minute, so **Accept** is available at
|
||||
once. The box layout is only a fallback: the strategies still run in their usual order and a
|
||||
|
||||
Reference in new issue