Files
OpenNest/scripts/check-ci-results.sh
T
ajandClaude Opus 5.5 aa7ee2035f ci: run fewer, shorter test jobs per push
Runners bill each job rounded up to the minute, and every job restored
and built the shared projects again. The small suites and the synthetic
nests now share one job that builds once; Engine.Tests, the longest,
runs beside it. A newer push cancels a stale run, and pushes that change
only docs or Markdown skip CI.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-23 16:24:55 -05:00

17 lines
532 B
Bash

#!/usr/bin/env bash
# The stable final CI check succeeds only when both required test jobs succeeded:
# the shared suites job (with the synthetic nests) and Engine.Tests.
set -euo pipefail
if [[ $# -ne 2 ]]; then
printf 'Expected suites and engine-tests job results.\n' >&2
exit 1
fi
if [[ "$1" != success || "$2" != success ]]; then
printf 'Required CI jobs did not both succeed (suites=%s, engine=%s).\n' "$1" "$2" >&2
exit 1
fi
printf 'All required unit suites, the synthetic nests and Engine.Tests passed.\n'