Every part the support grid could not hold level got a tabbed perimeter
with the outside lead-out after its tab, and planning refused any lead-out
after its own open cut, so with a lead-out configured no such part could
be planned. Pre-post review already proves such cuts release nothing (the
lead-out stays out of the tab gap); planning now runs the same proof, so
planning and review agree and a lead-out that reaches into the tab is
still refused.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>