Each blocked requirement was tied to the one stock where it needed the
fewest removals; once that stock's finite pool ran out the part stayed
unplaced even with another offered stock untouched. Recovery now runs in
rounds: a blocked part with demand left takes its best removal among the
stocks it has not tried that still have sheets (that stock's own minimal
run, C11). A variant used in several rounds stays one stock entry.
PM bf4438ac-929a-405f-ba26-fcfaa9b1c55e